Sustainability Progress
Building Efficiency Project
This project will conduct facilities improvement measures to 18 buildings on Main Campus. Projected annual utility savings are estimated at $352,000 with an additional $25,000 in operational savings. Annual carbon dioxide (CO2) savings are projected at 2,226 metric tons.
Anticipated Construction Start: ¹ó²¹±ô±ôÌý2024
Anticipated Completion: Fall 2025
Budget: $5,775,000
Number of buildings: 18
East Campus Solar Array
Current plans encompass the construction of a 1.1 megawatt (MW) ground-mounted solar array on a two-acre site east of parking Lot 566.
Anticipated Construction Start: June 2025
Anticipated Operational Date: ´³²¹²Ô³Ü²¹°ù²âÌý2026
Total Project Cost: $7,817,250
Size: 2 acres
ENVD Window Retrofit
CU Boulder will retrofit the windows of the Environmental Design (ENVD) building using INOVUES’ energy-saving window technology.
Anticipated construction start:Â Summer 2025
Anticipated completion:Â Fall 2025
Budget:Ìý$500,000
Geothermal Studies
CU Boulder is studying whether geothermal energy is feasible for the campus. If successful, this renewable energy solution would help reduce reliance on fossil fuels for heating and cooling, providing a more sustainable alternative that aligns with the CAP’s goal of achieving carbon neutrality by no later than 2050.
Anticipated construction start:Â Summer 2024
Anticipated completion:Â Spring 2026
Budget:Ìý$700,000
Virtual Net Metering Program
CU Boulder is taking advantage of virtual net metering, an innovative new program made possible by Colorado Senate Bill 21-26 in 2021, which enables organizations to benefit from the energy produced by offsite solar installations. The university will utilize solar power generated by the offsite net-metering solar project, without needing to install solar onsite. The offsite solar project feeds directly into the electric grid, with CU Boulder receiving credits for the renewable energy produced on its electric bills.
Anticipated construction start:Â Summer 2025
Anticipated completion:Â Spring 2026
Budget:Ìý°Õµþ¶Ù
²Ñ±ð²µ²¹·É²¹³Ù³Ù²õ:Ìý5-MWDC